Execution, Building Construction Supervision

Passive house Wijtschate - 10/2004. Arch. Denc!-studio Source: Passivehuis-Platform vzw
  • On-site quality control inspections to check for/assure heat bridges are being avoided.
  • Assure that insulation layers are continuous.
  • Check connection details for air-tightness while they are accessible.
  • Perform building pressure test:
    As soon as the airtight envelope is complete and while it is still accessible; that is, before the interior is finished (coordinate with all trades) for example using Blower Door n50-Test, including identification of leaks.